+86 187-3078-8077
Courriel:lgao1365@gmail.com
Accueil>Blog

Plate buckle type scaffold Exterior wall frame 345 B Hot galvanizing site quick frame New decoration removable steel pipe frame


Instructions for use of construction plate-buckle scaffold

Before erection: check the vertical rod, cross rod, diagonal rod and base of the plate buckle, and confirm that the parts are free of deformation and cracks, and the matching is qualified.
Erection: fix the base first, install the vertical rod according to the spacing, insert the cross rod joint into the vertical rod buckle and lock it, install the diagonal rod synchronously to ensure the stability of the frame body, and the erection height shall meet the specifications.
Use: Overloading is strictly prohibited. Scaffold boards shall be fully paved on the working surface, and protective railings and toe boards shall be provided.
Demolition: Demolition shall be carried out from top to bottom in layers. It is strictly prohibited to throw parts. After demolition, the parts shall be stacked in categories.

36646_yax4_9194.jpg

36738_avck_1480.jpg



Nouvelles récentes

Produits recommandés

Voir plus