+86 187-3078-8077
البريد الإلكتروني:lgao1365@gmail.com
الصفحة الرئيسية>مدونة

Build jacking with adjustable lead screw of build lead screw


Before installation, check whether the screw thread and chassis are in good condition and free from deformation and damage.
Position and place according to the construction requirements, and adjust the screw thread to lift the formwork to the specified elevation.
Special personnel shall be assigned for supervision during pouring, and timely reinforcement shall be carried out in case of looseness.
Clean and maintain after disassembly, and store properly



أخبار حديثة

المنتجات الموصى بها

عرض المزيد