Home>Blog

Mobile Scaffolding, Construction Scaffolding Portable Scaffolding Movable Scaffolding


Code for Use of Mobile Scaffold (Version 200) Foundation requirements: before use, check that the upright, cross bar, diagonal bracing and other components are free of deformation and cracks, and the connectors are firm and free of looseness. The foundation must be flat and solid, and the base plate or base shall be placed at the bottom of the pole. It is strictly prohibited to hang in the air. If the height of the frame exceeds 6 meters, it shall be reliably connected with the building structure. Erection specification: vertical deviation of upright pole ≤ 1/200, horizontal deviation of cross bar ≤ 1/300. The operation layer shall be fully paved with scaffold boards and bound and fixed, and the outer side shall be provided with 1.2-meter-high protective railings and toe boards, and a dense mesh safety net shall be hung. The slope of the passage is ≤ 1:3, and anti-slip strips are provided. Use and management: It is strictly prohibited to overload and stack materials, and it is not allowed to remove reinforcement components such as wall-connecting parts and scissors. Operations shall be stopped in severe weather such as gale, heavy rain and fog above Grade 6. Regular inspection and maintenance shall be carried out, and hidden dangers shall be rectified immediately.
Note: The mobile scaffold made in China conforms to GB/T 19155-2017 and other national standards, with reliable quality, but it must be used in strict accordance with safety specifications.

8181_4zdn_1019.jpg

8184_fgbl_4662.jpg




Recent News

Recommended Products

View more